Mapa do Metrô com a Linha 18-Bronze incluída Map of Metro Line 18-Bronze included |
O conselheiro do Tribunal de Contas do Estado de São Paulo e
relator do caso, Antonio Roque Citadini, não acolheu os argumentos do
MPC porque preferiu aguardar a manifestação do Metrô sobre o assunto. A
STM, por sua vez, informou que já prestou informações à corte de Contas.
A Linha 18-Bronze correrá por meio de um Monotrilho e deverá
interligar a região do ABC Paulista ao sistema metroferroviário por meio
de integração na Estação Tamanduateí (linha 2 – Verde do Metrô e Linha
10 – Turquesa da CPTM) e terá cerca de 15 quilômetros de extensão, com
13 estações. A previsão é que atenda até 337 mil passageiros por dia, de
acordo com a STM.
Fonte da Notícia: Via Trólebus
Imagem: Metrô
Despite the suspension of the bidding Line 18-Bronze, made by the prosecutor of Auditors José Mendes Neto, contended that there was "evidence" that the state government will hire companies metroferroviário cartel investigation in Switzerland, with the endorsement of the prosecution the State of São Paulo, the Department of Metropolitan Transportation will open the envelopes rather interested in the PPP today.
The counselor of the Court of the State of São Paulo and rapporteur of the case, Antonio Roque Citadini, rejected the arguments of the MPC chose to wait for the manifestation of the Subway on the subject. The STM, in turn, said he has already provided information to the court of Auditors.
The Line 18-Bronze will run through a Monorail and should link the region to the ABC Paulista metroferroviário system through integration into Tamanduateí Station (Line 2 - Green and Metro Line 10 - Turquoise CPTM) and have about 15 miles long with 13 stations. It is expected that meets up to 337,000 passengers per day, according to the STM.
Source of News: Via Trolébus
Despite the suspension of the bidding Line 18-Bronze, made by the prosecutor of Auditors José Mendes Neto, contended that there was "evidence" that the state government will hire companies metroferroviário cartel investigation in Switzerland, with the endorsement of the prosecution the State of São Paulo, the Department of Metropolitan Transportation will open the envelopes rather interested in the PPP today.
The counselor of the Court of the State of São Paulo and rapporteur of the case, Antonio Roque Citadini, rejected the arguments of the MPC chose to wait for the manifestation of the Subway on the subject. The STM, in turn, said he has already provided information to the court of Auditors.
The Line 18-Bronze will run through a Monorail and should link the region to the ABC Paulista metroferroviário system through integration into Tamanduateí Station (Line 2 - Green and Metro Line 10 - Turquoise CPTM) and have about 15 miles long with 13 stations. It is expected that meets up to 337,000 passengers per day, according to the STM.
Source of News: Via Trolébus
Nenhum comentário:
Postar um comentário